{"id":787,"date":"2026-10-01T09:00:00","date_gmt":"2026-10-01T01:00:00","guid":{"rendered":"https:\/\/xtzpadel.com\/?p=787"},"modified":"2026-09-29T17:52:04","modified_gmt":"2026-09-29T09:52:04","slug":"xtz-padel-national-day-holiday-schedule-2026","status":"publish","type":"post","link":"https:\/\/xtzpadel.com\/es\/xtz-padel-national-day-holiday-schedule-2026\/","title":{"rendered":"XTZ Padel National Day Schedule 2026: Orders, Production and Support During the Golden Week"},"content":{"rendered":"<blockquote><p><strong>Key Takeaways<\/strong><br \/>&#8211; XTZ Padel&#8217;s office and factory follow the official National Day holiday schedule from October 1 to 7.<br \/>&#8211; The production line continues with a reduced crew, so manufacturing time is not interrupted for orders already in the queue.<br \/>&#8211; Quote requests sent during the holiday are answered within one business day after the team returns.<br \/>&#8211; Clients who confirm drawings before the holiday keep their place in the production queue.<\/p><\/blockquote>\n<p>As China marks its National Day holiday, the team at XTZ Padel wants every club owner, contractor and distributor we work with to know exactly what to expect from our factory during the Golden Week \u2014 and how to use the pause productively for your own project.<\/p>\n<h2>What stays open during the holiday<\/h2>\n<p>Our sales and engineering offices follow the official holiday calendar from October 1 to 7. During this period, the workshop keeps a reduced crew on the line. That means court modules already in production keep moving \u2014 welding, galvanizing and assembly of steel frames continue without a full stop.<\/p>\n<p>New orders confirmed before the holiday are locked into the queue with their technical drawings frozen. If your drawings are still under review, the fastest path is to settle open questions now, so that your project enters the queue on the first working day after the holiday.<\/p>\n<h2>What to prepare if you want to order this quarter<\/h2>\n<p>The most useful thing you can do during the holiday week is finish the homework on your side. Three items decide how fast a court project moves once it reaches us:<\/p>\n<ul>\n<li><strong>Site dimensions and access.<\/strong> Confirm the usable footprint and how containers or trucks reach the site. Our project checklist walks through this step by step.<\/li>\n<li><strong>Court type and configuration.<\/strong> Whether you need a framed <a href=\"\/es\/classic-padel-court\/\">classic padel court<\/a> for a commercial venue or a full-glass layout, the choice drives both steel structure and pricing.<\/li>\n<li><strong>Local approvals.<\/strong> Planning permission requirements vary by country and municipality, and they are the one step we cannot shorten from the factory side.<\/li>\n<\/ul>\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/xtzpadel.com\/wp-content\/uploads\/2026\/08\/\u5fae\u4fe1\u56fe\u7247_20260625085908_270_62-1024x768.jpg\" alt=\"Modern regulation padel court under a blue sky\" width=\"1024\" height=\"768\" \/><\/figure>\n<p>If those three items are ready, the path from confirmed order to installation is straightforward: manufacturing takes 20&#8211;30 days, ocean freight to Europe runs 25&#8211;45 days, and on-site assembly by a local team typically takes 3&#8211;7 days once materials arrive.<\/p>\n<h2>How we handle incoming requests during the holiday<\/h2>\n<p>Every quote request, drawing and follow-up question sent through the holiday is logged the moment it arrives and answered within one business day after our office reopens. Nothing is lost, and the order of the queue is preserved. If your project is time-sensitive \u2014 a venue opening, a season start, a signed contract with an installation date \u2014 mention the deadline in your first message so we can flag it.<\/p>\n<p>For a structured overview of every stage from site survey to installation, see our <a href=\"\/es\/padel-court-project-planning-checklist\/\">padel court project planning checklist<\/a>.<\/p>\n<h2>Plan the week, then let us handle the rest<\/h2>\n<p>National Day week is a natural pause point for European and Latin American buyers: clubs are between seasons, committees have time to meet, and budgets for the new year are being shaped. Using the week to finalize your court specification means your project starts moving the moment our office is back.<\/p>\n<p>Ready to move forward? <strong>Send us your site plan and court requirements through the <a href=\"\/es\/contact\/\">request a quote<\/a> page<\/strong> \u2014 during the holiday or any time \u2014 and the XTZ Padel team will pick it up with a full technical review and quotation.<\/p>\n<p><em>Written by the XTZ Padel Team \u2014 a padel court manufacturer and supplier serving clubs, contractors and distributors worldwide.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>XTZ Padel&#8217;s National Day schedule: what stays open during the Golden Week, how order queues are handled, and how to plan your court project.<\/p>","protected":false},"author":1,"featured_media":848,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-787","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/posts\/787","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/comments?post=787"}],"version-history":[{"count":2,"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/posts\/787\/revisions"}],"predecessor-version":[{"id":844,"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/posts\/787\/revisions\/844"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/media\/848"}],"wp:attachment":[{"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/media?parent=787"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/categories?post=787"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/xtzpadel.com\/es\/wp-json\/wp\/v2\/tags?post=787"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}